Case Study: EV Chargers for Business
Client: Hybrid Services Ltd, Cheshire
Completed: September 2021
Number of Points: Six – with infrastructure for more points
Location: Crewe, Cheshire
Services Used
- EV Infrastructure Design
- Ground Works
- EV Installation
- Maintenance
Hybrid Services Ltd: Charge Point Installation for Fleet & Staff.
Site
Hybrid Services Ltd is a high-tech specialist printer & ink distributer in Crewe Cheshire, operating from a large building on a prestigious business park
Project scope
Hybrid Services wished to install EV points to charge their electric fleet vehicles and offer free workplace charging to their employees.
They already had and operated an EV/Hybrid fleet but had no safe & efficient way of charging the vehicles. Our task was to replace their temporary domestic electrical leads and install a safe and efficient solution by installing dedicated EV charging points.
The free chargers needed to be only accessible to the staff and clients of Hybrid Services.
Contract arrangements
We were awarded the contract because of our skillset and understanding of the client’s specific needs and budget.
Proposal & results
We completed the EV installation project on time and budget with minimal disruption to the customer.
As part of our proposal, we selected workplace chargers manufactured by Easee. Easee products were an excellent match for this project as they have no subscription costs and have free back-office software. Additionally, as the client did not wish to charge their staff for using the EV points, the Easee hardware was the perfect match.
We always make sure that our quotes do not include systems with expensive features that our customers will never use; however, we make sure the system installed can be upgraded in the future – should the needs of the client change.
Hybrid Services are ‘over the Moon’ with the results.
The Results
A set of charging bays that utilise smart technology to ensure the continual best use of available power.
The charging facilities are stylish and integrate well into this innovative modern building.
What did the client think of the installation?
“We recently employed Sustainability Solutions to plan and install an electric vehicle charging solution for our business so we could provide charge facilities for Staff, Visitors and our electric fleet.
They took the time to really understand our requirements and presented a practical solution that matched our needs and budget. They carried out the work to an excellent standard, and we are over the moon with the results.”Paul Brett.
Hybrid Services Ltd