Case Study: Sustainability contribution with EV charge points.
Client: Beechfield Brands Ltd
Sector: Textile Manufacturing/Fashion
Completed: January 2023
Budget: £52,000
Number of Points: 26
Location: Bury, Greater Manchester
Services Used
- EV Infrastructure Design
- Ground Works
- EV Installation
- Line Markings
Beechfield Brands: Car park EV charging for a textile company in Bury, Greater Manchester.
Site
Based in Bury, Beechfield Brands Limited is the HQ of four leading textile brands. Sustainability is high on the company’s priority, they have already been awarded Carbon Literate Bronze certification. The company wished to install free-to-use EV charge points in the car park for staff and visitors.
Project scope
They required a ‘turn-key’ solution of infrastructure design, civil works, installation and line markings. We used dynamic load balancing to ensure the system efficiently utilised the available power.
Contract arrangements
We were offered the work based on our skill-set, quote and reputation.
Proposal & results
We completed the project on time and budget with minimal disruption to the working of the business.
We selected workplace chargers manufactured by Easee. Easee products were an excellent match for this project as they have no subscription costs and free back-office software. While the system is currently configured to allow for the free use of the charge points should the client wish to add a payment system, this can be easily implemented.
The results were excellent and very well received by the client. We were delighted to have aided Beechfield Brands on their route to increased sustainability by the installation of 24 EV charge points.